Free Web Hosting by Netfirms
Web Hosting by Netfirms | Free Domain Names by Netfirms

duntech 

 

reed beds

Links: Home Micro & Drip Sprinklers Techcrop Hydroponics CF-2 Fogging Clients
rhizobiotic effluent treatment systems & bio-fuel plantations

Nature's own biological effluent treatment system - developed and managed for the efficient treatment of biodegradable effluents.
Minimal maintenance - Aesthetically pleasing - Environmentally rewarding - Appreciating asset.
Suitable for primary and tertiary treatments. Simple to construct from local materials but does require adequate land and careful management and development. Flexible to loads and volumes once established.

environment

 

Contact us for information

British Steel Corporation, South Wales

Design, and management of the installation of 18 hectares of Reed Beds. For total treatment of coke oven effluent. Duntech were responsible for the design and detailed drawings, negotiation tender for earthwork contractor. Appointment of contractor. On-site engineering and supervision of the construction works. Contract financial accounts management, including site payroll and welfare.

 

ICI plc, Teesside

Design, and management of the installation of 5 hectares of Reed Beds for treatment of phenol, amines, and methacrylate effluent.

 

Rhone Poulenc, Staveley, Derbyshire

Design, supply, installation and analytical monitoring of pilot Reed Beds. For the treatment of ammonia, aniline, nitribenzene, aminophenols, diaminodiphenyl ester, monochlorinated anilines and toluene effluent.

 

Rhone Poulenc Rorer, Dagenham, Essex

Design, supply, installation and analytical monitoring of pilot Reed Beds. For the treatment of phenols, acetone’s, amines, methanols and solvents effluent.

 

British Aerospace Defence Ltd., Bridgwater, Somerset

Feasibility reports, site surveys and investigations, and design for the construction of a 5-hectare Reed Bed Treatment System. Preparation of fully detailed design, drawings and specification. Construction of the reed beds, supply and installation of pumps and associated control and monitoring system to final commissioning. On completion of construction an eighteen-month management contract was secured to manage the reed beds to their full treatment potential. Treatment of effluents from explosives manufacture.

 

Huntsman Corporation, South Wales

Feasibility reports, site surveys and investigations, effluent trials for Reed Bed treatment proposals Following successful trials, full detailed design and costing of 0.5-hectare reed bed system. Design and build management contract secured. Work completed August 1996. Systems commissioned and better than expected results are being obtained. Effluents containing morpholine and associated chemicals.

 

Bostwarthen Village, Penzance

Design and build small reed bed for barn housing development.

 

Pioneer Aggregates Ltd, Lydd. Kent

Supply and planting of phragmites for gravel pit refurbishment.

 

P Dutton Badgworth Grange, Somerset

Design and installation of domestic reed bed for septic tank overflow treatment

 

Enviro-Logic Limited, London Office Development

To initial advice and design of Reed Beds for effluent treatment of office complex of 4500 people.

 

Bawdsey Manor, International School, Suffolk

To design of Reed Beds for effluent treatment from septic tanks for 500 people.

 

IBM Retail Development, Greenford

Design and advice on reed bed for constructed wetland area on environmentally sensitive retail development together with supply and planting of phragmites and ongoing management of the reed bed.

 

The Body Shop International PLC

Design proposal to treat the process effluent via a reed bed, which will provide the required discharge consent level and ‘beautify’ a redundant area of the site.

 

Mr & Mrs T Wass The Old Rectory Puttenham Bucks

Design and build reed bed for domestic effluent treatment.

 

Cardiff International Airport

Design and management of reed bed for simulated fire fighting area foam run-off.

 

Thrift Development Limited Cassington

Design and management of reed bed construction for septic tank run-off from 150pe barn office development.

 

Our commitment is to design and install economic & environmental systems to suit individual client requirements.