Free Web Hosting by Netfirms
Web Hosting by Netfirms | Free Domain Names by Netfirms

duntech 

 

hydroponics

Links: Home Micro & Drip Sprinklers CF-2 Fogging Reed Beds  Clients
techcrop - hydroponics
Protected commercial hydroponic growing methods designed to client and local requirements. Leads to self sufficiency and reduces the need for importation of fresh produce. A fully automated system for plant production which economises on water and energy. Locally available materials are used wherever possible. Systems can be installed with local labour utilising Duntech supervision. Foreign exchange requirements can therefore be reduced.

 

 

 techcrop

 

Contact us for information

 

 

 

Our commitment is to design and install economic & environmental systems to suit individual client requirements.

Agroexport, Greece

2 Hectare Techcrop salad production complexes. Turnkey, design and installation of greenhouses, service and utility buildings, fully computer controlled hydroponics growing system for the production of salad crops. Management support package.

Arab Supply Corporation, Saudi Arabia

Design, supply of 2 hectare Techcrop complex.

Turnkey, design and installation of greenhouse, service and utility buildings, fully computer controlled hydroponics growing system for the production of salad crops. Management support package.

Seychelles Marketing Board, Seychelles

Design, supply, installation - Phase 1

Three years management and local training.

10000 square metres Techcrop protected crop nursery installation. (From jungle site to managed project)

On going supply of fertilisers and consumables, and technical backup.

Seychelles Marketing Board, Seychelles

Design, supply, installation - Phase 2

10000 square metres Techcrop system - extension to Phase 1 Comprising 10,000 square metre single structure polytunnel, with specially designed energy free roof vent system.

Including pumps generator, tractor, spraying and other equipment, and all necessary and associated pipework, valves and fittings. Duntech carried out the complete installation and commissioning in eight weeks. (Duntech were also able to arrange finance package from London bank for a 5 year repayment loan for Seychelles Government) On going supply of fertilisers and consumables, and technical backup.